]> git.evergreen-ils.org Git - Evergreen.git/commit
LP#1329503 avoid run now + later combined schedule
authorBill Erickson <berick@esilibrary.com>
Fri, 8 Aug 2014 00:39:47 +0000 (20:39 -0400)
committerBen Shum <bshum@biblio.org>
Fri, 8 Aug 2014 01:51:58 +0000 (21:51 -0400)
commitde728768aec76dc1daeb6ee6d28d2eecb8c18fd1
tree64b16344ae88c82d66678081b8bca8a22780cde4
parent2f2859c083d25c3384931267ed756722c2a639fc
LP#1329503 avoid run now + later combined schedule

When editing a report, ensure only one of "now" vs. "schedule for later"
options is selected by default.  Similarly, if the schedule option is
activated by default, ensure the date fields are enabled.

If the run time of the most recent report is in the past, default to the
current date for the schedule instead of the no longer valid date.

Signed-off-by: Bill Erickson <berick@esilibrary.com>
Signed-off-by: Ben Shum <bshum@biblio.org>
Open-ILS/web/reports/oils_rpt_report_editor.js